Saturday, March 10, 2012

Noodle House Progress!

After a week of busting concrete, digging, piping, pouring concrete the drainage and port entry are finished. Now to make the front sliding gate and weld up the iron fencing that goes on top of the concrete fence in front. At the bridge the water will drain into the prefab gutter which will drain into the large street "gutter" or canal. Each prefab piece weighted 167kilos so moving them into place was a back killer!



No comments:

Post a Comment